Computing Wall-Clock Time: Pipeline vs. Barrier

A workflow needs to process 4 independent modules, each through 3 stages: scan, refactor, test. The per-module, per-stage durations (in minutes) are:

Module scan refactor test
M1 2 5 1
M2 4 2 2
M3 1 3 4
M4 3 1 1

Assume unlimited parallel agent capacity (no queueing).

  1. Compute the total wall-clock time under a barrier design, where all 4 modules must finish a stage before any module starts the next stage. Show the per-stage waits.
  2. Compute the total wall-clock time under a pipeline design, where each module moves through its own stages independently.
  3. Explain, referencing the specific numbers, why the gap between the two grows as you add more modules or more stages, not just as a coincidence of this particular example.